STEP 1
Technical brief
Output rate, materials, tolerances, footprint, power supply and what the machine has to integrate with at your end.
Service · equipment and production lines
Two quotations carrying the same model name can be different machines. A different motor, a different controller, safety guarding treated as an option, tooling listed as an accessory. The gap shows up when the crate is opened, several thousand kilometres from the person who wrote the quote.
None of these are exotic. All of them are ordinary, and all of them are visible before payment if somebody looks.
STEP 1
Output rate, materials, tolerances, footprint, power supply and what the machine has to integrate with at your end.
STEP 2
Builders with a real record in this equipment type, checked in the state register, ideally with reference installations.
STEP 3
Component by component, with every difference surfaced — so the cheapest quote is judged on what it actually contains.
STEP 4
Configuration, acceptance criteria, spares, documentation, warranty and payment milestones tied to stages rather than dates.
STEP 5
We attend, the machine runs, we check it against the specification and record it on video. Problems are resolved before packing, not after arrival.
STEP 6
Export crating appropriate to the equipment, the right transport mode for the dimensions, and the documentation your import needs.
Import
Importing into the EU
Machinery carries real importer obligations — worth settling who holds them before the order is placed.
Service
Inspection and acceptance
Witnessed testing at the manufacturer, against the configuration you actually paid for.
Freight
Shipping to Europe
Out-of-gauge and heavy-lift equipment needs the route planned around the cargo, not the other way round.
Because a machine is a configuration, not a product. Two quotations with the same model name can differ in the motor, the controller, the safety guarding and what counts as an accessory. The cheapest quote is usually the one with the most things quietly left out, and that only becomes visible when the crate is opened.
Running the machine at the manufacturer's premises, on your material where possible, before it is packed. It is the last moment at which a problem is cheap. Once equipment is on a ship, a missing component turns a two-day fix into a two-month one.
Machinery placed on the EU market falls within the machinery legislation and generally requires CE marking, a declaration of conformity and a technical file. The importer established in the EU carries real obligations here. Chinese manufacturers vary enormously in how seriously they take this, which is precisely why the paperwork has to be checked before purchase rather than after arrival.
We agree it in the contract rather than assume it. Depending on the equipment that can mean supervised installation, remote commissioning support, a spare parts package bought with the machine, or training for your operators. Spares in particular are far cheaper ordered with the line than sourced urgently a year later.
Describe the product and the volume. We come back with a workable structure, a quote including landed cost, and an honest lead time — or with the reasons we would not take it on.